×

Marina City Development, Infra Works - Abu Dhabi, UAE

A 64 Villa Complex +4 residential building B + G + 6.
Sewerage, storm water, and potable water network are the Alghanim International scope of work with the details below:
Sewerage Network: 3km pipe Line 225 Dia. + 116 Manholes and House Connections.
Storm Water Network: 5km pipe Line 200 to 1000 Dia. + 180 Inlet + 66 Manhole + 2 Interceptors + 2 Outfall.
Potable Water Network: 3km pipe Line 160 Dia. + 21 Valve Chamber.