Home > Projects > Shuwaikh EPP Emergency Power Plant (300 MW ISO)
Shuwaikh EPP Emergency Power Plant (300 MW ISO)
Project completed 6 months from contract signature. "This is by far the fastest project of this size GE ever built" – commendation by a Senior Executive from GE.
Project EPC Contract for 300 MW ISO Gas Turbine Plant at Shuwaikh Kuwait
Client Ministry of Energy (Electricity and Water)
Main Contractor Alghanim International
Alghanim Role Main EPC Contractor
Value USD. 270,000,000/-
Duration 6 Months Construction + 5 Years O&M
Project Features:
6 x GE LM6000 Gas Turbine Generator Sets
3 x 120 MVA, 11/132 kV Generator Step Up Transformers – GE Prolec
2 x 5000 Tons Chillers for Turbine Inlet Cooling and Cooling Towers – TAS
4 x 1250 HP Fuel Gas Compressors – Valerus
132 kV H.T. XLPE Cables – GE Supply / Kerite
 
View Photo Gallery
Our Recent Projects
Az-Zour South
  Gas Turbine Power Plant (1,000 MW)
Shuwaikh E.P.P.
  Emergency Power Plant (300 MW ISO)
Sabiya E.P.P.
  Emergency Power Plant (300 MW ISO)
Az-Zour South
  Combined Cycle Conversion (560 MW)
Az-Zour E.P.P.
  Emergency Power Project 2008 (900 MW)
Al-Khafji Project (Saudi Arabia)
  Installation of 4th Turbine (42 MW)
Sabiya
  Gas Turbine Power Plant (2,000 MW)
   
   
 
Home | Company | Power Div | Projects | O&M  |  Logistics  |  Quality  |  Contact Us
Tel: +965 24814355, 1804044, Fax: +965 24847197
© 2011 Alghanim International, All rights reserved.
 
  ISO 9001
Certified
Photo Gallery | Webmail
Designed By: