Sitemap
Home > Company Overview > Our People
Alghanim International - Our People
Our Strength:
Elite engineering and construction team which thrives on the challenge of breaking construction records.
Construction of gas power project comprising 6 nos. GE LM 6000 turbines in 6 months is the fastest in the history of GE.
Construction of a 890 MW gas power project comprising of 5 nos. of Alstom GT 13 E2 gas turbines in 11 months.
Strength of the Team:
60 specialist Engineers with international experience in various engineering aspects of the power industry.
Civil Design department with international standard office infrastructure.
Over 600 skilled Technical Specialists in the electrical and mechanical field of power project construction.
International Procurement Department with extensive experience in dealing with reputed OEM’s for Gas Turbines and vendors for the BOP equipments.
Logistic Department capable of handling forwarding and shipping from any part of the world.
State-of-the art equipment fleet including heavy cranes.
Innovative construction control tools.
Innovative progress monitoring tools.
Electrical cable management tools.
Our Recent Projects
Az-Zour South
  Gas Turbine Power Plant (1,000 MW)
Shuwaikh E.P.P.
  Emergency Power Plant (300 MW ISO)
Sabiya E.P.P.
  Emergency Power Plant (300 MW ISO)
Az-Zour South
  Combined Cycle Conversion (560 MW)
Az-Zour E.P.P.
  Emergency Power Project 2008 (900 MW)
Al-Khafji Project (Saudi Arabia)
  Installation of 4th Turbine (42 MW)
Sabiya
  Gas Turbine Power Plant (2,000 MW)
   
   
 
Home | Company | Power Div | Projects | O&M  |  Logistics  |  Quality  |  Contact Us
Tel: +965 24814355, 1804044, Fax: +965 24847197
© 2011 Alghanim International, All rights reserved.
Download
Company Profile
(6 MB)
ISO 9001
Certified
Photo Gallery | Webmail
Designed By: