Home > Projects > Az-Zour South Gas Turbine Power Plant (1,000 MW)
Az-Zour South Gas Turbine Power Plant (1,000 MW)
First firing achieved 13 months from the day of notice to proceed
Project EPC Contract for 1000 MW Gas Turbine Plant at Az-Zour South, Kuwait
Client Ministry of Energy (Electricity and Water)
Main Contractor Siemens A/G
Alghanim Role Consortium Partner
Value USD. 450,000,000/-
Duration 2 Years
Project Features:
8 x V94.2 Siemens Gas Turbine Generator Sets
2 x 11/132 kV Generator Step Up Transformers – Siemens
2 x 11/275 kV Generator Step Up Transformers – Siemens
3200 Tons Chiller Plant – Trane
10 km x 132 kV XLPE and 275 kV Oil Filled H.T. Cables – Brugg
 
View Photo Gallery
Our Recent Projects
Az-Zour South
  Gas Turbine Power Plant (1,000 MW)
Shuwaikh E.P.P.
  Emergency Power Plant (300 MW ISO)
Sabiya E.P.P.
  Emergency Power Plant (300 MW ISO)
Az-Zour South
  Combined Cycle Conversion (560 MW)
Az-Zour E.P.P.
  Emergency Power Project 2008 (900 MW)
Al-Khafji Project (Saudi Arabia)
  Installation of 4th Turbine (42 MW)
Sabiya
  Gas Turbine Power Plant (2,000 MW)
   
   
 
Home | Company | Power Div | Projects | O&M  |  Logistics  |  Quality  |  Contact Us
Tel: +965 24814355, 1804044, Fax: +965 24847197
© 2011 Alghanim International, All rights reserved.
 
  ISO 9001
Certified
Photo Gallery | Webmail
Designed By: