Home > Projects > Az-Zour Emergency Power Project 2008 (900 MW)
Az-Zour Emergency Power Project 2008 (900 MW)
Project EPC Contract for 890 MW Gas Turbine Power Plant at Az-Zour South, Kuwait
Client Ministry of Energy (Electricity and Water)
Main Contractor Alghanim International
Alghanim Role Main EPC Contractor
Value USD. 1,000,000,000/- (US $ 1 Billion)
Duration 10 Months Construction + 5 Years O&M
Achievement Project completed ahead of schedule. M/s Alstom and other major vendors commented, “The project is the fastest project in the history of gas turbines of similar size, including a 9 bay GIS”.
Project Features:
5 x GT 13E2 from Alstom
MV Switchgear from ABB
LV Switchgear from ABB
5 x 250 MVA GSU – ABB
9 Bay GIS – ABB
1.6 KM 300KV cable – Taihan
6 Km 300 KV cable – Prysman
6 x 2500 HP Gas compressor complex–Valerus
Oil Treatment system – Westfalia
 
View Photo Gallery
Our Recent Projects
Az-Zour South
  Gas Turbine Power Plant (1,000 MW)
Shuwaikh
  Emergency Power Plant (300 MW ISO)
Sabiya
  Emergency Power Plant (300 MW ISO)
Sabiya
  Gas Turbine Power Plant (2,000 MW)
Az-Zour South
  Combined Cycle Conversion (560 MW)
Az-Zour
  Emergency Power Project 2008 (900 MW)
Al-Khafji Project (Saudi Arabia)
  Installation of 4th Turbine (42 MW)
   
   
 
Home | Company | Power Div | Projects | O&M  |  Logistics  |  Quality  |  Contact Us
Tel: +965 24814355, 1804044, Fax: +965 24847197
© 2011 Alghanim International, All rights reserved.
 
  ISO 9001
Certified
Photo Gallery | Webmail
Designed By: