Home > Projects > Al-Khafji Project (Saudi Arabia) Installation of 4th Turbine (42 MW)
Al-Khafji Project (Saudi Arabia) Installation of 4th Turbine
(42 MW)
Project Al-Khafji Joint Operations Installation of 4th Gas Turbine
Client KJO Joint Operations
Main Contractor Alghanim International
Value USD 65 Million
Duration Ongoing Projects
Scope of Work:
Procurement and installation of one new GE Frame 6B gas turbine
Design, procurement, installation and commissioning of the following new Components:
Exhaust Stack - Braden
Mark VIe control systems from GE Controls for the new gas turbine
11 kV 45 MVA Transformer - Areva
11 kV Switchgear - ABB
All necessary retrofit works in the project, for integration of the new gas turbine
Upgradation of existing three gas turbine control systems from Mark V to Mark VIe
 
View Photo Gallery
Our Recent Projects
Az-Zour South
  Gas Turbine Power Plant (1,000 MW)
Shuwaikh E.P.P.
  Emergency Power Plant (300 MW ISO)
Sabiya E.P.P.
  Emergency Power Plant (300 MW ISO)
Az-Zour South
  Combined Cycle Conversion (560 MW)
Az-Zour E.P.P.
  Emergency Power Project 2008 (900 MW)
Al-Khafji Project (Saudi Arabia)
  Installation of 4th Turbine (42 MW)
Sabiya
  Gas Turbine Power Plant (2,000 MW)
   
   
 
Home | Company | Power Div | Projects | O&M  |  Logistics  |  Quality  |  Contact Us
Tel: +965 24814355, 1804044, Fax: +965 24847197
© 2011 Alghanim International, All rights reserved.
 
  ISO 9001
Certified
Photo Gallery | Webmail
Designed By: