Al-Khafji Project (Saudi Arabia) Installation of 4th Turbine
(42 MW) |
|
| Project |
Al-Khafji Joint Operations Installation
of 4th Gas Turbine |
| Client |
KJO Joint Operations |
| Main Contractor |
Alghanim International |
Value |
USD 65 Million |
| Duration |
Ongoing Projects |
|
|
| Scope of Work: |
|
 |
Procurement and installation of one new GE Frame 6B gas turbine |
 |
Design, procurement, installation and commissioning of the following new
Components: |
 |
Exhaust Stack - Braden |
 |
Mark VIe control systems from GE Controls for the new gas turbine |
 |
11 kV 45 MVA Transformer - Areva |
 |
11 kV Switchgear - ABB |
 |
All necessary retrofit works in the project, for integration of the new gas turbine |
 |
Upgradation of existing three gas turbine control systems from Mark V to Mark VIe |
|
| |